
Captiva Island
Pool builder on Captiva, between the Gulf and the sound
Captiva is small, unincorporated and shaped by storms. A pool here is designed around a raised house, a limited site and a beach that has to stay dark at night.
Captiva has no city hall. The island is an unincorporated community governed by Lee County, so a pool builder on Captiva Island works through county permitting and the county's coastal and lighting rules rather than a municipal code. The Gulf runs along the west shore and Pine Island Sound along the east, and most design decisions come back to which of those two waters the house faces.
The island's outline is a record of hurricanes. A 1921 storm cut Redfish Pass and split off North Captiva, a 1926 surge opened Blind Pass between Captiva and Sanibel, and Charley in 2004 cut a new inlet through North Captiva. Ian came ashore on Cayo Costa, just to the north, in 2022. A pool here is built for water that arrives from the side, and the codes are written with that in mind.
We model every Captiva pool in 3D with the house, the stair, the screen and the planting in place, so you can judge it from the living level as well as from the deck. Matt Lombardo leads each design and holds Florida's Certified Building Contractor and Commercial Pool/Spa Contractor licenses. The full sequence, from survey to start-up, is laid out in our design and construction process.
01
How a Captiva pool builder plans for a raised house
When a coastal house is lifted, Florida's flood rules for coastal high hazard and Coastal A zones leave the pool three honest options. It can be raised so the structure carrying it sits at or above the design flood elevation. It can be built to break away in a design flood without throwing damaging debris. Or it can stay in the ground, flush with grade, engineered not to push water toward the house or its neighbors.
Each option changes the architecture. A pool level with the living floor captures the view, but its supporting structure becomes part of the house's flood analysis, and the foundation has to carry any added flood load. A pool at grade keeps the engineering simpler. It can even sit beneath the raised house, provided its top and deck are flush with the ground and the space around it is not walled in on every side.

02
Gulf side or sound side
On the Gulf, the pool belongs to the beach view and has to answer to the beach. Pools seaward of Florida's Coastal Construction Control Line fall under Department of Environmental Protection requirements in addition to the county's, and the program exists to protect the beach and dune system, dune plants and nesting turtles.
Toward Pine Island Sound and Roosevelt Channel, named for Theodore Roosevelt, who fished there, the outlook is quieter water and morning light. Where there is a dock, we draw the pool, the deck and the dock as one waterfront rather than three separate projects, with the terrace stepping toward the water instead of turning its back on it.
03
Lighting a pool on a dark island
Lee County's sea turtle season runs from May 1 through October 31, and the Captiva Erosion Prevention District asks owners to keep beachfront lighting from being visible on the beach at night. The county's Captiva regulations add light trespass standards for outdoor lighting on top of the turtle rules.
That favors a particular kind of pool light: low, shielded and warm. We place underwater fixtures to light the water rather than the sky, keep step and path lights below eye level, and program lighting scenes so the pool can glow after dinner and go dark on a schedule.
04
A pool that looks after itself between visits
For owners who are not on the island all year, the pool has to run well without them. Automation lets you check water temperature, run filtration and switch lights from a phone, and a pool service company of your choosing keeps chemistry and equipment in order while the house is closed. Our first 30 days of care leave the system balanced and set up for the way you use the house.
Placement of that equipment matters on Captiva. State guidance asks that pool equipment not rated for submersion be raised as far as practical, anchored against flotation and fed by ground-fault protected circuits, and that pool chemicals be stored above the flood elevation plus freeboard.
Neighborhoods
Where we build in Captiva Island
South Seas
The resort and yacht harbor on the northern two miles of the island, where Lee County changed height and density rules for the resort in 2023.
Roosevelt Channel
The east side of the island, facing Pine Island Sound and the morning sun.
Blind Pass
The south end, where a small bridge crosses the pass a 1926 surge opened and dredging reopened in 2009.
The Gulf shore
West-facing beach lots where the control line, the dunes and turtle lighting all bear on the pool.
Services
Our work in Captiva Island
- Custom Pool DesignRaised, breakaway or in-ground: the flood strategy is chosen in 3D before the architecture is fixed.
- New Pool ConstructionPool shells and supporting structure built to ASCE 24 where the flood zone calls for it, with sealed documents for county review.
- Pool DecksShellstone, travertine or pavers detailed to drain away from the water and to meet coastal rules for decks.
- Custom Spas and Hot TubsA spa sized to the terrace you actually use, placed to catch the sunset off the Gulf.
- Pool Automation and LightingShielded, warm lighting on timers and remote control of heat and filtration while you are away.
Lombardo projects
Pools we have designed and built








FAQ
Building a pool in Captiva Island
Who permits a pool on Captiva Island?
Lee County. Captiva is unincorporated, so building permits, flood review and the county's Captiva rules all run through the county. Gulf-front work seaward of the Coastal Construction Control Line is also subject to Florida Department of Environmental Protection requirements. Our Florida pool regulation guide covers the statewide rules.
Can my pool be level with my raised living floor?
It can, but it is the most engineered option. In coastal high hazard and Coastal A zones the pool must meet ASCE 24, so a pool at the living level needs its supporting structure at or above the design flood elevation, and the house foundation must account for any added flood loads. That analysis is sealed by a registered engineer or architect.
Will a vanishing edge work on a Gulf-front Captiva lot?
Sometimes. Florida's floodplain guidance treats the wall that forms a vanishing edge as an obstruction in coastal zones, so it needs a wave analysis from a design professional or one of the arrangements the state describes, such as a breakaway wall spanning between pilings. We decide this early, because it shapes the whole terrace.
How long does a Captiva pool take?
Permitting and engineering usually set the pace more than construction does. A coastal pool needs sealed structural documents, county review and, seaward of the control line, state requirements as well. We give you a schedule once the design and the permit path are clear, rather than a number before either exists.
Can a Captiva pool be heated through the winter?
Yes. Heating, salt systems and automation are all part of our equipment work. In a flood zone the heater and controls are raised as far as practical and anchored, so the equipment pad is planned with the house, not left for the end.
Service area
Captiva Island and the Gulf Coast
From Punta Gorda and Boca Grande to Marco Island, Lombardo Pools designs and builds for waterfront estates, island homes and gated golf communities along the Gulf Coast.
- 01Pool builder in NaplesCollier County
- 02Pool builder in Fort MyersLee County
- 03Pool builder in Cape CoralLee County
- 04Pool builder in Bonita SpringsLee County
- 05Pool builder in EsteroLee County
- 06Pool builder in Sanibel IslandLee County
- 07Pool builder in Captiva IslandLee County
- 08Pool builder in Marco IslandCollier County
- 09Pool builder in Fort Myers BeachLee County
- 10Pool builder in Boca GrandeLee County
- 11Pool builder in Punta GordaCharlotte County

